Apr 25, 2016 17:49
8 yrs ago
английский term

fill on trips

английский => русский Техника Нефтепромысловые науки и технологии Drilling Fluid Engineerin
It is highly recommended that each weighting up increment of 0.05 SG to be accompanied with 5 – 10 % addition of fresh fluid, to ensure enough free-water in the system for other product’s to work effectively, and to prevent excessive viscosities and Gel strengths.
Cuttings at the shale shakers should be monitored for any signs of caving that may indicate a need for an increased drilling fluid weight.
Tight hole, ***fill on trips and torque or drag on connections can also be good
Proposed translations (русский)
4 +1 долив скважины при СПО
Change log

Apr 25, 2016 17:49: changed "Kudoz queue" from "In queue" to "Public"

Proposed translations

+1
27 мин
Selected

долив скважины при СПО

....
Peer comment(s):

agree Andrey Korobeinikov
10 час
Something went wrong...
4 KudoZ points awarded for this answer.
Term search
  • All of ProZ.com
  • Поиск термина
  • Заказы
  • Форумы
  • Multiple search